In July 2017, a powder coating line was designed, produced and installed for an agricultural equipment manufacturing company. The line includes: a polymerization oven 3 meters long, a polymerization oven 7 meters long, a two-station spraying chamber with a lower transport system for a trolley, a spraying unit with a tank and a multicolor spraying unit.



