Project №141

Project №141 for the client:

  • Installation of electrical parts (thermoblock from 60 to 72 kW) on the polymerization furnace

Installation of the electric part (thermoblock from 60 to 72 kW) on the polymerization furnace

The package includes:

  • installation of the thermoblock structure
  • installation of electrical parts
  • delivery

The frame part of the polymerization furnace is manufactured by the Customer.

Delivery completeness:

  • Automatic control panel – 1 pc.
  • Power cabinet – 1 pc.
  • Thermal converter TSP1-3-Pt100 – 1 pc.
  • Thermoblock – 1 pc.
  • Shadow cassettes
  • Power – from 60 to 72 kW
  • Convection fan – 1 pc.
  • Exhaust fan – 1 pc.
  • A set of air ducts according to the dimensions of the Customer’s furnace box – 1 set
  • Track cable – 1 set