Project №195

Project №195 for the client:

  • Polymerization furnace with convection 6x2x2 walk-through with thermal block
  • The KN-3MAX camera is dual-post
  • Installation for applying paint Multiloc
  • Transport system guides into the furnace and chamber of 2 accumulators of 20 pendants

poroshkovaya-kraska-oborudovanie-photo-00003-ava

© 2022 by Smart Line - All rights reserved
design by
X